Priority Project 18

Waterway axis Rhine/Meuse-Main-Danube

Click map to view enlarged version

 PROJECT DESCRIPTION

 

PP18 crosses Europe transversally from the North Sea at Rotterdam to the Black Sea in Romania. The Meuse and the Rhine rivers are the entrance gates for the Belgian and Dutch inland waterways to this Priority Project corridor, linking the northern ports of Rotterdam and Antwerp but also offering a connection towards the Seine-Northern Europe Canal, part of PP30. The Rhine river, through the Main river and the Main-Danube Canal, is connected to the Danube river that flows until the Black Sea. This corridor is one of the longest ones in the Trans-European Transport Network and crosses both EU countries and non-Member States.

 

In recognition of the complexity and multifaceted aspects presented by this project and of PP30, Inland Waterway Seine-Scheldt, Mrs Karla Peijs was appointed European Coordinator for Inland Waterways by the European Commission in September 2007.

Learn more about the active projects managed by the Agency that make up Priority Project 18:

As this website continues to be updated and enhanced, more project information will be added as it becomes available!


 2013-DE-18007-S

Upgrade of the Danube Straubing-Vilshofen subsection 1 (Straubing-Deggendorf), design and approval planning + public consultation within the frame of the planning approval procedure


 2013-AT-18016-S

Studies for the expansion of the trimodal Port of Linz (Priority Axis 18)


 2012-EU-18089-S

High-performance Green Port Giurgiu


 2012-EU-18067-S

LNG Masterplan for Rhine-Main - Danube


 2012-AT-18070-P

Expansion of the tri-modal inland port by land recovery


 2008-SK-92308-S

Project Documentation and Modernisation of Bratislava old bridge


 2007-RO-92301-S

D. A. N. U. B. E.: Danube Access Network – Unlocking Bottlenecks in Europe, by developing a high quality TEN-T ports infrastructure in Romania on optimal economic terms – Feasibility study phase


 2007-NL-18010-P

Maasroute, Upgrade of inland waterways from class Va to class Vb specifications


 2007-HU-18090-S

Improvement of the navigability on the Danube


 2007-DE-18050-S

Independent variant research on the development of the Danube between Straubing and Vilshofen


 2007-DE-18030-P

New construction of the rail bridge above the Danube at Deggendorf


 2007-BE-18070-P

Construction of a 225 x 25 m chamber navigation lock, its ancillary works and a pumping station / hydroelectric power plant on the Albert Canal, to the east of the existing lock complex at Lanaye


 2007-BE-18040-P

Studies for the construction of a 225m x 25m (Class VIb) lock in Huy (Ampsin-Neuville) and the works of a 225m x 25m (classe VIb) lock in Flémalle (Ivoz-Ramet), both on the Meuse river


 2007-AT-18020-P

Implementation integrated river engineering project Danube East of Vienna


 

 TEN-T policy background and other information related to the projects are available on the DG Mobility & Transport website


 See projects by country or transport mode

 

 
 
(Mailing address)
INEA
European Commission
W910
B-1049 Brussels
(Visiting address)
Chaussée de Wavre 910
B-1040 Brussels
Belgium